Completion and Well Intervention
Candidates:
Drilling, Work over and Production Engineers as well as Reservoir and service facilities engineers. Senior Geoscientists and team leaders are also good candidates.
Summary:
The workshop is structured to establish a thorough understanding of basic design consideration of well completion methods and provide participants with in-depth knowledge of equipment selection (based on design criteria) in completion & work over programs. It aims to highlight the interface between the members of a multidisciplinary team including production technologists, drilling engineers, completion engineers, well production engineers, reservoir engineers and geoscientists.
Contents:
- Introduction
- Types of completion
- Completion selection & design criteria
- Completion productivity
- Completion equipment
- Perforation techniques
- Hydraulic Fracturing
- Acidizing Techniques
- Squeeze cementing
- Coiled Tubing
- Wireline intervention.